Four new primary school buildings will be officially inaugurated on Wednesday, May 6, 2009, by Minister of Education Patrick Faber, as a part of the Minister’s countrywide tour of all schools throughout the country.
The Minister of Education’s tour started last year, right after he assumed his ministerial role, and he now resumes the second leg to continue hearing concerns of stakeholders and taking stock of the condition of schools countrywide.
On Wednesday, Minister Faber will join representatives of the European Union in Belize and the Social Investment Fund (SIF) in the inauguration of the new Bella Vista RC Primary School, Trio Government School, San Juan Primary School and United Community School projects in Toledo.
Other guest speakers for the occasion will include Ian McMillan, Executive Director of the Social Investment Fund; Isabel Gayot, Country Representative of the European Union; Area Representative for Stann Creek West, Hon. Melvin Hulse; and Area Representative for Toledo East, Hon. Peter Eden Martinez.
A total of 1,978 school children will benefit from the four SIF projects, financed under the European Union Banana Support Programme to Belize at a total cost of BZ $1.4 million. The respective communities also contributed labor towards the projects.
The EU Banana Support program is focusing on the following three critical areas: (a) market and transit facilities in the banana belt; (b) improved access to technical high school education; and (c) improved access to adult skills training.
The new school buildings in Trio, Bella Vista and San Juan are similar in size and design. The work scope for the project in these communities included the construction of a 3,600 sq ft single-storey reinforced concrete school building measuring 30 ft wide by 120 ft long. The building is comprised of four classrooms with one movable partition wall between two classrooms, a female and male bathroom block and an administration office.
Meanwhile, the work scope for the United Community School project entailed the construction of a two–storey reinforced concrete building, which measures 60 ft, 10 inches long by 31 ft, 2 inches wide. Each level has two and half classrooms, 24 ft long by 25 ft wide, and a front verandah.
The half classroom space will be used as a male and female sanitary block on the ground level, and a principal’s office and teacher’s bathroom space on the upper level.
The project entailed the provision of two stairways, electrical installation, and a standard septic tank with soak away for the sanitary blocks.
Furniture was also supplied to the schools as part of the project.
The buildings are designed to withstand up to category 5 hurricane winds.

